TRADO
PREPARING FOR WAR TODAY.. .AND TOMORROW
TOTAL ARMY SCHOOL
SYSTEM
Office of the Deputy
Chief of Staff for
Education ( DCS ED )
WHERE TOMORROW'S VICTORIES BE Qm ~
TRAOO
EXECUTIVE AGENT FOR
ADRS TASS
INTEGRATION
DA DCSOPS HAS APPOINTED
TRADOC, DOSED AS THE EXECUTIVE
AGENT TO OVERSEE THE ADRS
TRAINING STRATEGY
IMPLEMENTATION
WHERE TOMORROW'S VICTORIES BEG1LL
TRADO
PREPARING FOR WAR TODAY.. .AND TOMORROW
WHAT ARE WE DOING?
• Identifying constraints and
working through them using
MOUs and CCR
• Clarifying guidance from
MACOMs to subordinate units
WHERE TOMORROW'S VICTORIES BEG1LL
PREPA
Army National
Guard
Division
.Redesign
Study
■ anOrtd^6 g
... a long standing
problem.
... highlighted by
Commission on Roles and
Missions (CORM) &
Quadrennial Defense
Review (QDR).
• $2B programmed from FYOO-
05, additional $3B (est.)
required to complete plan.
Complete necessary
procurement by FY07 and
conversions by FY09.
Approx. $600M per year
required.
• ADRS
□ Reduces risks to Warfighting
CINC's.
□ Supports National Military
Pre - TAA05
Resourcing
Conference
Medical ADRS (2 OK) Future
Restructuring & ADRS
Initiative (MRI)USAR (4K) Buys Buys
in TAA01
Proposed Timeline
Remaining
TAA05
Unresourced
Requirements
Phase I (3 Maneuver Brigades)
FY05
FY09
Phase II (3 Maneuver Brigades)
Phase III (3 Maneuver
Brigades + Division
Slice)
S VICTORIES BEG1LL
m
w
Phase IV (3
Maneuver Brigades +
Division Slice)
RNCi combat, units
TRADOC
PREPARING FOR
A?#A
IV
Al L
DRS Implementatio
• Meets critical CINC
requirements that the
Army (ASOS) must
provide
'• Builds a capability
* 3 divisions remain in
current configuration.
• 3 divisions with 1
enhanced Separate
Brigade (the eSB
displaces a divisional
maneuver brigade and
becomes the third
brigade in the division).
• 6 eSB's as part of the
two AC/ARNG Integrated
Divisions
• 6 stand alone eSBs.
ARNG Combat Structure at End State
yy
T
Q
XX.
AC/ARNG
'htegrated Di
M
AC/ARNG
itegrated DR
24th ID (M) (-)
FT Riley, KS
X_
1 Enhance
prigade
T
J
7th ID (-)
FT Carson. CC
X_
Enhance
: brigade
J
30th Mech Bde (NC)39th IN Bde (4
218th MechBde (SC)4i s t IN Bde (OR)
48th Mech Bde (GA)45th IN Bde (C
3 eSBs
assigned
y to AR NG
Enhanced
Brigades
T
6 eSBs not
assigned
R)
K)
2 ARNG composite
divisions (formed by
reconfiguring 2 existing
ARNG divisions)
^M^fg: units
30 Combat
Brigades
Converted
Structure
ARNG
[Composite
with 6 composite
brigades
ARNG
[Composite
12 ARNG Combat Brigades & Two Divisioi
Slices Reorganized To Form CS/CSS
2-38 IN Bde
(IN)
Lip, (IN)
ions
• 6 stand alone composite
brigades formed from
t he conversio n IO^/WIp^^morrow s victories begin
convert.
ID, (KS)
1 - 4ft A R Brie (CA)
40 ID, (CA)
h (-)
Div Base Only
TRADOC
PREPAK
IV
Phase 1 Force Structure Actions
--FY99-05
What's the inactivation time line?
[Ml
11 actions are
programmed ii
IAMAS
_LL
C3>
FWD
SPT
FWD
SPT
&
u
FWD
SPT
■
1 1
CZ5
U
CZ5
m
' FY99 1
1 FYOO 1
1 FY01 1
1 FY02 1
1 FY03 1
1 FY04 1
1 FY05 '
1,269 spaces 824 spaces
2,552 spaces 1,246 spaces
3,805 spaces
615 spaces
Phase 2
(3 Brigades)
Who is affected?
Affected brigades
and states for
Phase 2 will be
identified as part
of the TAA07
Resourcing
Conference/late
summer
WHERE TOMORROW'S VICTORIES BEG1LL
TRADOCP
P RE
ING FOJ
AT #A
AW
Al L
PRINCIPLE?
[Units to People,
Not People to
it«
ADRS Phase 1 Activa
87 unit
activations
FY00-05
8 ;
FYOO
FYiOir
u
HHD
J Hh D
J_L
HH
111
HHD
-i T
HHD
POL
(X4h
FY02
n
EOD
HHD
11
FY04
i
n
EPW
x
Y05
11
lL
RECON/C-'- FTFT
z:
Const Sp ;
LN
(X8)
T
Q
CE
ECON
Kl
RECON/DECON
1
POL
PLS
J
w
. RECl^N
J.
MP
POL
rwL
y
1
V
rz
POL
POL
R CON/DECON
MP
(X6)
. R
(Conversion)
MP
) 4
HET
WATER
C 2
1 actions are'
programmed ii
SAMAS
09/ 01/ 1 6
WHERE TOMORROW'S VICTORIES BEG1LL
TRADOC
PREPARL
AT #A
AW
il L
ADRS PHASE 1 Require
CONCEPT:
Field totally
mission capabli
units — C3
* Equipping <fd
managed LINS)
* Equipping (Common
LINs)
* Training (MOSQ, Phase I
& II)
* Installation
* Equipment
Redistribution
$760M
TBD
$100M
$193M
Inactivatior s
Activations
AR Bn
IN Bn (Mect|)
nvironm^nttHM Bn
FSB
HHD CM Bn Recon Co
HHD POL Sup Bn (X^Missile Spt Co (Coi|ps)
HHD EOD Bn Maint Co (DS)
EPW Bn Med Trk Co - CGO
Recon/Decon Co (X2)
FYQO
Equip (proc) $15.2M
Equip (c ommon LINs)-
Training
Installation
Equip Redisrtib
TOTAL $15. 2M
FYQ1 FYQ2
$149. 6M $285. 2M
TBD TBD
$ 10. OM $ 15. 0M
$ 14.3M $ 71. 3M
$ 12. 1M $ 8.3M
$186. OM $379. 8M
FY03
$253. 6M
TBD
$ 25. OM
$ 52. 8M
$ 20. 8M
$352. 2M
FY04
$ 38. 8M
TBD
$ 25. OM
$ 27. 2M
$ 11.4M
$102. 3M
FY05
$ 17. 1M
TBD
$ 25. OM
$ 27. 9M
$ 7.2M
$ 77. 2M
WHERE TOMORROW'S VICTORIES BEG1LL
TOTAL
$ 759. 5M^ FUNDED
TBD
$ 100. 01^" FUNDED
$ 193. 5M
$ 59.8M
$1112. 9M
PREPARING-
AT #A
AW
il L
combination
distance
learning,
ADRS PHASE 1 Requireme
oi
Training = $100.0M (Phase I & II FUND]
&.cr
act
FY01 - $
10. OM
FY 02 - $
15. OM
FY03 - $
25. OM
FY04- $
• TASS is the mechanism to
accomplish ADRS training —
not RC specific
• ENL - MOSQ reclassification
NCO - CASCOM developing
transition criteria/courses
OFF - CASCOM developing
officer qualification criteria
• ATRRS has requirements for
FY00-FY02; FY03-FY05 will be
validated through the SMDR
• lBfif&T&%eted to train 100% of DMOSQ Reclas^fi-lafW^-
Requirements FVO ^ <b
• Geographic dispersion precludes cross-leveliBg^BetWfeeiJp
• Units currently under-strength recruit to 100%^t?engfti^
• 60% of new recruits are prior service and require
reclassification training
• A 1-year carrier UIC approved
• 70% of the training conducted in carrier year
• 30% of the training conducted in the year of execution
• Personnel holding MOS (duty, primary, or secondary)
needed in new unit are assigned against that position —
1,011 spaces (AC School
= 2, Region B = 4,
Region F = 189, &
Region G = 816) loaded
in ATRRS
Total Phase 1 retraining requirements
11 MOSs comprise 85% of the total
88M
54B
77F
92A
95B
63S
= 2,68B3B = 158
= 867 52D = 119
= 722 71L = 85
= 316 92R = 85
= 298 92Y = 54
= 179
lDRS - 4% of
FY00-02
requirement
& 13% of
FY03-05
Normal TASS process to
identify ADRS MOSQ training
requirements & resources
TRADOC synchronization
process coordinates
capabilities between AC & RC
schools and validates
requirements
TRADO
PREPARING FOR WAR TODAY.. .AND TOMORROW
ADRS OVERVIEW
• INTENT: TO CONVERT EXISTING LOWER PRIORITY ARNG
COMBAT UNITS TO HIGHER PRIORITY SUPPORT FORCES
• IMPACT: TWO PHASE PROGRAM
- PHASE I FY00-05 6,580 RECLASS TRAINING
REQUIREMENTS
- PHASE II FY 03-05 APPROXIMATED 9K SPACES
- 11 MOSs COMPRISE 85% OF THE RECLASS MISSION
• STATUS:
- 100M FUNDED FOR TRAINING THROUGH FY 05
- 48% OF PHASE I RECLASS REQUIREMNTS CAPTURED IN
ATRRS
- REMAINING PHASE I REQUIREMENTS TO BE CAPTURED
DURING SMDR PROCESS
WHERE TOMORROW'S VICTORIES BEG1LL
PREPARING FOR WAR TODAY.. .AND TOMORROW
TRADOC INITIATIVES
• THE PLAYERS: NATIONAL/REGIONAL/LOCAL
- N G B/U S ARC/D AMO -TR/DC SED
- TAGs/POTOs, DIVs(IT)/SOTOs, QUOTA MANAGERS
- TASS BN/RTI COMMANDERS OR THEIR
REPRESENTATIVE
• SCHEDULED KICK-OFF MEETINGS
- CONDUCTED 10-11 JUN REGION G
- CONDUCTED 15-16 JUN REGION F
- SCHEDULED 21-22 JUL REGION E
• FUTURE PLANNING SESSIONS
- SCHEDULED MONTHLY
- MOVING TO QUARTERLY
WHERE TOMORROW'S VICTORIES BEG1LL
• GOAL: To coordinate the training
requirements of the Army Division Redesign
Study (ADRS) conversions to ensure the Tri-
component resources are identified,
available, and utilized for mission success.
•Courses of Action:
•TASS BN lead training (Reclass)
-Mobile Training Teams
-Distance Learning
- IDT/ADT
•Resident training at Proponent Schools
-Initial Entry Training
- Reclass
WHERE TOMORROW'S VICTORIES BEG1LL
TRADO
TASS ADRS STRATEGY
( cont.1
• Cornerstone of ADRS mission success is the
identification of resources needed and the
completion of Cross Component Resourcing NOUs for
the following:
- Equipment
- Facilities
-Certified instructors
- Location/time/date needed
-Flexibility and cooperation between all three
Compos
• Look at Distance Learning (DL) courseware
development schedule for the Phase I MOS courses
needed and re-prioritize master priority list to
ensure needed DL courses are completed as
required .
WHERE TOMORROW'S VICTORIES BEG1LL
TRADO
■I § I'M lliMfl lal MTiTfil aMliyiV^ilillifciiliMil I
TASS ADRS STRATEGY
(cont)
• Study Proponent Schools and IET slots
available and alternate courses of action to
include:
-Expanding present training base
-USAF, USN, and USMC resources
-Contract private industry for location/teams
-Simulation alternatives
• Establish quarterly coordination meeting
with USARC, NGB, DIV (IT)s, RTIs, and TRADOC
through FY00 to ensure mission success with
ADRS Phase I piece of TASS.
WHERE TOMORROW'S VICTORIES BEG1LL
TRADOC
PREP/
L\#
A
Training.
ADRS RECLASS REQUIREMENTS IN
ATRRS
iucting
Training Requirements from ATRRS data pulled 990621
@ 11:00 hrs.
FY00-02 accounts for 3,127 of the Phase I requirement.
TASS REGION
FY-00
FY-01 ^
FY-02
FY-03
REGION A
0/13036
0/10166
1/10094
3/10703
REGION B
4/15100
40/11746
16/11619
38/12027
REGION C
0/14075
4/14108
4/14122
6/14752
REGION D
0/10603
0/8146
0/8062
6/8621
REGION E
0/16290
4/12319
2/12262
2010/15297
REGION F
111/23962
474/19538
462/18964
1214/20469
REGION G
776/22316
743/20055
486/19706
512/20922
TOTALS:
891/115382 1265/96078
971/94829
3789/102791
ADRS / TOTAL REQUIREMENT
WHERE TOMORROW'S VICTORIES BEGIN
TRADOC
PREPARING FOR WAR TODAY.. .AND TOMORROW
These are the 11 major ADRS requirements for reclass
training
COURSE
FY-00
FY-01 |
FY-Q2
88M
310/4526
302/4082
460/3690
1966/5210
548
168/1479
414/1359
222/1168
594/1830
77F
182/1649
102/1351
14/1333
86/1406
92A
52/2102
66/1841
42/1842
134/1943
95B
68/3201
28/2629
46/2644
324/2922
63S
0/319
8/361
24/385
63/424
63B
1/826
38/833
19/827
34/842
52D
1/665
22/542
12/529
136/644
71L
7/940
11/696
8/693
30/715
92R
0/63
0/94
0/94
0/94
92Y
8/1709
10/1462
8/1461
20/1476
TOTALS:
797/17479
1001/15250
855/14666
3387/17506
ADRS / TOTAL REQUIREMENT
WHERE TOMORROW'S VICTORIES BEG1LL
TRADO
PREPARING FOR WAR TODAY.. .AND TOMORROW
CACI ITRM
• ITRM is a DA initiative to capture the "true
cost" of individual training and readiness.
• CACI is the DA contractor building ITRM.
• ITRM is a POI-based automated accounting
system, with "what if ?" capabilities
• ITRM will be used to fund ADRS and is a
"key system" in future DA funding decisions.
• Cooperation with CACI staff on inputs to
ITRM modules is critical to each MACOM.
WHERE TOMORROW'S VICTORIES BEG1LL
TRADOC
PREPARING FOR WAR TODAY.. .AND TOMORROW
NEXT STEPS
• MOUs finalized within 90 days
• RTCC / NTCC / SMDR
• Conduct Quarterly Regional ADRS
meetings
09/ 01/ 1 6
WHERE TOMORROW'S VICTORIES BEG1LL